CLIENT
University of Technology, Sydney
LOCATION
Ultimo, NSW
OUR INVOLVEMENT
  • Geotechnical investigation
  • Drilling boreholes and temporary anchor holes
  • Rock inspection and stabilisation
  • Soil testing

Project challenges

The 12-storey building was constructed over four basement levels and required excavations to a maximum depth of approximately 23m. The Transgrid tunnel and a possible future twin railway tunnel were major constraints.

Our Solutions

JK Geotechnics completed two-dimensional finite element modelling to assess the tunnels’ impact. We completed a comprehensive geotechnical investigation and during the construction phase we assisted with installing shoring piles, drilling temporary ground anchor holes and stress testing temporary ground anchors. We also carried out regular inspections of rock excavation faces and proposed rock-face stabilisation measures.

JK Environment completed soil and groundwater testing.